410 IAC 32-1-2
410 IAC 32-1-2 "Abatement" defined
Cite as Ind. Admin. Code tit. 410, r. 32-1-2
Sec. 2. (a) "Abatement" means any measure or set of measures designed to permanently eliminate lead-based paint hazards.
(b) The term includes, but is not limited to, the following:
(1) The removal of lead-based paint and lead-contaminated dust.
(2) The permanent enclosure or encapsulation of lead-based paint.
(3) The replacement of lead-painted surfaces or fixtures.
(4) The removal or permanent covering, such as with pavement or concrete, of lead-contaminated soil.
(5) All preparation, cleanup, disposal, and post-abatement clearance testing activities associated with such measures as described in
this subdivision.
(6) A project for which there is a written contract or other documentation, that provides that a person will be conducting activities
in, or to, a residential dwelling or child-occupied facility that:
(A) results in the permanent elimination of lead-based paint hazards; or
(B) is designed to permanently eliminate lead-based paint hazards as are described in subdivisions (1) through (5).
(7) A project resulting in the permanent elimination of lead-based paint hazards, conducted by persons licensed under this article and
IC 16-41-39.8 unless the project is described under subsection (c).
(8) A project resulting in the permanent elimination of lead-based paint hazards, conducted by persons who, through the person's
company name or promotional literature represent, advertise, or hold themselves out to be in the business of performing lead-based paint activities
as identified and defined by this section, unless the projects are described under subsection (c).
(9) A project resulting in the permanent elimination of lead-based paint hazards that is conducted in response to state or local
abatement orders.
(c) The term does not include the following:
(1) Renovation, remodeling, landscaping, or other activities, when such activities are not designed to permanently eliminate lead-based
paint hazards, but are designed to repair, restore, or remodel a structure or dwelling, even though these activities may incidentally result in a reduction
or elimination of lead-based paint hazards.
(2) Interim controls, operations or maintenance activities, or other measures designed to temporarily, but not permanently, reduce lead-
based paint hazards.