410 IAC 32-1-69

410 IAC 32-1-69 "Risk assessment" defined

Last amended: 2023Year: 2027Length: 51 wordsOfficial source

Cite as Ind. Admin. Code tit. 410, r. 32-1-69

Sec. 69. "Risk assessment" means: (1) an on-site investigation to determine the existence, nature, severity, and location of lead-based paint hazards; and (2) the provision of a report by the individual or the firm conducting the risk assessment explaining the results of the investigation and options for reducing lead-based paint hazards.
410 IAC 32-1-69: 410 IAC 32-1-69 "Risk assessment" defined | Justis AI