410 IAC 5-10.1-14

410 IAC 5-10.1-14 Inspection and maintenance

Last amended: 2025Year: 2027Length: 131 wordsOfficial source

Cite as Ind. Admin. Code tit. 410, r. 5-10.1-14

Sec. 14. (a) Each licensee or registrant shall conduct, at intervals not to exceed 6 months, a program of inspection and maintenance of source holders, logging tools, source handling tools, storage containers, transport containers, and injection tools to assure proper labeling and physical condition. Records of inspection and maintenance shall be maintained for a period of 2 years for inspection by the board. (b) If any inspection conducted pursuant to 410 IAC 5-10.1-14(a) reveals damage to labeling or components critical to radiation safety, the device shall be removed from service until repairs have been made. (c) The repair, opening, or modification of any sealed source shall be performed only by persons specifically authorized to do so by the board, the U.S. Nuclear Regulatory Commission, an agreement state or a licensing state.
410 IAC 5-10.1-14: 410 IAC 5-10.1-14 Inspection and maintenance | Justis AI