410 IAC 6-12-11
410 IAC 6-12-11 Permit conditions
Cite as Ind. Admin. Code tit. 410, r. 6-12-11
Sec. 11. The department may specify in its construction permits any limitations, terms, or conditions necessary to provide a functional,
easily operated, enduring facility or to prevent a health or safety hazard, nuisance, surface water pollution, or ground water pollution. In addition,
all construction permits shall contain the following requirements, not necessarily verbatim:
(1) The permit shall expire on the last day of the twelfth month following the month of permit issuance, unless the applicant has started
construction of the facility on or before the date of permit expiration.
(2) That all necessary local permits and approvals shall be obtained before construction is begun.
(3) That any proposed changes, alterations, or additions to the approved facilities be submitted to the department for review and
approval prior to the start of construction that will effect the proposed changes, alterations, or additions.
(4) That, if pollution, health hazards, or nuisance conditions occur that are attributable to the facility permitted, immediate corrective
action shall be taken by the owner.
(5) That the permittee notify the department and the local health department at least seven (7) days before construction of the approved
facilities is to commence.