410 IAC 6-8.3-45

410 IAC 6-8.3-45 "Soil loading rate" defined

Last amended: 2024Year: 2027Length: 28 wordsOfficial source

Cite as Ind. Admin. Code tit. 410, r. 6-8.3-45

Sec. 45. "Soil loading rate" means the allowable rate of application of septic tank effluent to the soil. It is expressed in gallons per day per square foot.
410 IAC 6-8.3-45: 410 IAC 6-8.3-45 "Soil loading rate" defined | Justis AI