410 IAC 6-8.3-77

410 IAC 6-8.3-77 Subsurface trench alternating field on-site sewage systems: design and construction requirements

Last amended: 2024Year: 2027Length: 84 wordsOfficial source

Cite as Ind. Admin. Code tit. 410, r. 6-8.3-77

Sec. 77. (a) Subsurface trench alternating field on-site sewage systems shall meet all of the requirements of: (1) sections 74 and 75 of this rule; and (2) this section. (b) Each side of the soil absorption system shall contain the total square footage of soil absorption area calculated from section 74(a) of this rule. (c) A diversion valve shall be installed between the septic tank and the distribution boxes. An access riser, extending to the ground surface, shall be installed over the diversion valve.
410 IAC 6-8.3-77: 410 IAC 6-8.3-77 Subsurface trench alternating field on-site sewage systems: design and construction requirements | Justis AI