410 IAC 6-9-2

410 IAC 6-9-2 Construction notice; permit

Last amended: 2025Year: 2027Length: 245 wordsOfficial source

Cite as Ind. Admin. Code tit. 410, r. 6-9-2

Sec. 2. (a) Any person planning to construct or enlarge for occupancy or use any camp or facility thereto appertaining, or to convert any premises to use as a camp, shall give written notice to the board on such forms as the board may require. This notice shall be given not later than sixty (60) days before the starting date of such construction, enlargement, or conversion. Upon receipt of said notice, the board shall provide necessary information to the notifier, including consultation as indicated. The board may require, and the notifier shall provide, such further information as the board shall need. (b) Compliance with local laws and regulations shall be accomplished by the notifier. (c) Application for a permit to operate an agricultural labor camp shall be made to the board in such form and manner as the board may prescribe, and said application shall be made not later than sixty (60) days prior to the start of the operation of the camp. (d) If, after necessary investigation and inspection, the board is satisfied that the camp is in substantial compliance with statutory and regulatory requirements, a permit shall be issued. (e) In case of single ownership of multiple camps, each camp, within the meaning of the act, shall have a permit. (f) When a change of camp operator is contemplated, the new operator shall file an application for a permit with the board within fifteen (15) days of the effective date of the transfer.
410 IAC 6-9-2: 410 IAC 6-9-2 Construction notice; permit | Justis AI