170 IAC 5-3-2.6
170 IAC 5-3-2.6 Establishment of MAOP on distribution system
Cite as Ind. Admin. Code tit. 170, r. 5-3-2.6
Sec. 2.6. (a) An operator complies with 49 CFR 192.619(a)(4) for existing pipelines less than one hundred (100) psi if the operator
establishes the maximum allowable operating pressure (MAOP) on a section of distribution system pipeline in compliance with Method 5 for
establishing MAOP in 49 CFR 192.624(c)(5). For purposes of this section, the following table replaces Table 1 to § 192.624(c)(5)(ii):
Required Patrols Leakage surveys
After
the final leak survey to establish the MAOP under this section, at least 1 additional patrol within the following 3 months. After the final
leak survey to establish the MAOP under this section, at least 1 additional leak survey within the following 3 months.
(b) Pipelines with an MAOP established under this section shall thereafter be patrolled and surveyed in accordance with 49 CFR 192.721
and 49 CFR 192.723.