170 IAC 5-5-2.1

170 IAC 5-5-2.1 Notice of inability to provide location information

Last amended: 2024Year: 2027Length: 132 wordsOfficial source

Cite as Ind. Admin. Code tit. 170, r. 5-5-2.1

Sec. 2.1. (a) The notice under IC 8-1-26-18(m) shall be an oral, a written, or an electronic contact with the person responsible for the excavation or demolition. The operator shall make a written record, contemporaneously at the time of the contact, containing at a minimum: (1) the date, time, and manner of the communication; (2) the name of all individuals that participated in the communication; and (3) the new date by which the operator will provide the location information as required by IC 8-1-26-18. (b) An operator of a pipeline facility that does not provide notice as specified in this section: (1) fails to notify the person responsible for the excavation under IC 8-1-26-18(m); and (2) if IC 8-1-26-18(j) otherwise applies, the operator is subject to the penalty specified in IC 8-1-26-18(j).
170 IAC 5-5-2.1: 170 IAC 5-5-2.1 Notice of inability to provide location information | Justis AI