170 IAC 8.5-4-28
170 IAC 8.5-4-28 Main extension route
Cite as Ind. Admin. Code tit. 170, r. 8.5-4-28
Sec. 28. (a) The utility shall use good engineering and sewer utility practices in determining the route for all main extensions. Any facilities
installed in connection with main extensions shall become the property of the sewer utility.
(b) The utility shall determine the total length of the extension from its existing main to serve the extension to the end of the lot or frontage
of the most remote applicant to be served.
(c) If the end lot or frontage is a corner lot or frontage abutting an intersecting street in which no main is located, the end of the new
extension may not extend beyond the intersecting street corner of that lot.
(d) If the street in which the main is to be laid dead ends in a cul-de-sac or appears to be permanently dead ended against a railroad, creek,
river, or other major physical or natural barrier, the end point of the main extension, if serving the most remote lot or frontage, shall be the point
of the most remote service pipe connection, which connection point shall be at least ten (10) feet beyond the lot line.