675 IAC 14-4.4-76
675 IAC 14-4.4-76 Section R606.3.5.2; cleanouts
Cite as Ind. Admin. Code tit. 675, r. 14-4.4-76
Sec. 76. Change the text of SECTION R606.3.5.2 to read as follows:
Provisions shall be made for cleaning the space to be grouted. Mortar that projects more than 1/2 inch (12.7 mm) into the grout space
and any other foreign matter shall be removed from the grout space prior to grouting. Cleanouts shall be provided in the bottom course of masonry
for each grout pour where the grout pour height exceeds 64 inches (1,626 mm). In solid grouted masonry, cleanouts shall be spaced horizontally
not more than 32 inches (813 mm) on center. The cleanouts shall be sealed before grouting and after inspection.