675 IAC 15-1.5-6

675 IAC 15-1.5-6 Third party inspection agency; renewal of authorization

Last amended: 2023Year: 2027Length: 127 wordsOfficial source

Cite as Ind. Admin. Code tit. 675, r. 15-1.5-6

Sec. 6. (a) An application for renewal for a third party inspection agency shall be filed with the office of the state building commissioner thirty (30) days before the expiration of authorization. (b) A renewal application shall be filed in accordance with section 2 of this rule. (c) If there are no changes to the original application submitted as set out in section 2 of this rule, the third party inspection agency shall be required to submit a letter requesting a renewal. (d) Fees for a renewal shall be paid in accordance with 675 IAC 15-1.6. (e) If the third party inspection agency fails to renew their authorization, the third party inspection agency may no longer perform in-plant inspections or certify industrialized building systems or mobile structures.
675 IAC 15-1.5-6: 675 IAC 15-1.5-6 Third party inspection agency; renewal of authorization | Justis AI