675 IAC 15-1.5-6
675 IAC 15-1.5-6 Third party inspection agency; renewal of authorization
Cite as Ind. Admin. Code tit. 675, r. 15-1.5-6
Sec. 6. (a) An application for renewal for a third party inspection agency shall be filed with the office of the state building commissioner
thirty (30) days before the expiration of authorization.
(b) A renewal application shall be filed in accordance with section 2 of this rule.
(c) If there are no changes to the original application submitted as set out in section 2 of this rule, the third party inspection agency shall
be required to submit a letter requesting a renewal.
(d) Fees for a renewal shall be paid in accordance with 675 IAC 15-1.6.
(e) If the third party inspection agency fails to renew their authorization, the third party inspection agency may no longer perform in-plant
inspections or certify industrialized building systems or mobile structures.