675 IAC 15-1.6-3

675 IAC 15-1.6-3 Penalty fees

Last amended: 2023Year: 2027Length: 138 wordsOfficial source

Cite as Ind. Admin. Code tit. 675, r. 15-1.6-3

Sec. 3. (a) In accordance with 675 IAC 15-1.2-3, it shall be unlawful for production of an industrialized building system or mobile structure to begin without first obtaining a construction design release. (b) The following fees are applicable if production is started before the issuance of a design release: (1) System plan review, including structural/typical systems: (A) filing fee $60 (B) residential, add-a-room, or duplex $6403 (C) commercial $1,0103,4 (2) Addenda, including structural/typical systems: (A) filing fee $60 (B) residential, add-a-room, or duplex $1703 (C) commercial $210 3,4 Notes: 3Includes only the original floor plan. A one hundred dollar ($100) fee is charged for each additional floor plan. Crawlspace or basement plans are considered a floor plan. 4Includes two (2) units as a completed structure. A one hundred dollar ($100) fee is charged for each additional module unit.
675 IAC 15-1.6-3: 675 IAC 15-1.6-3 Penalty fees | Justis AI