25 IAC 2-5-5
25 IAC 2-5-5 Scope and design of project commensurable with allocation
Cite as Ind. Admin. Code tit. 25, r. 2-5-5
Sec. 5. It shall be the intent of the Division, Designer and operating unit to make every effort in the scope and design of the project to ensure
that the low bid will be within the allocation prior to soliciting bids in order to preclude the bidders from expending efforts and costs to formulate
bids with little possibility of being awarded and in so doing divulging their bid to others prior to a possible rebid.