25 IAC 2-6-8
25 IAC 2-6-8 Low bid exceeds available funds
Cite as Ind. Admin. Code tit. 25, r. 2-6-8
Sec. 8. If the low bid exceeds the allocation, and additional funds are requested but not approved, then bids shall be rejected and project
suspended or rebid with design revised in value equivalent to the overrun.