675 IAC 30-3-11

675 IAC 30-3-11 Inspection reports

Last amended: 2025Year: 2027Length: 156 wordsOfficial source

Cite as Ind. Admin. Code tit. 675, r. 30-3-11

Sec. 11. (a) The first operating permit inspection of a boiler shall be reported on a form patterned after Form NB-5 set forth in Part 2 of the NBIC. Subsequent operating permit inspections of these objects shall be reported on a form patterned after Form NB-6 set forth in Part 2 of the NBIC. (b) The first operating permit inspection of an unfired pressure vessel shall be reported on a form patterned after Form NB-5 in Part 2 of the NBIC. Subsequent operating permit inspections of these objects shall be reported on a form patterned after Form NB-7 in Part 2 of the NBIC. (c) The inspection reports mentioned in subsections (a) and (b) shall be submitted to the division within thirty (30) days of the date of the inspection. The results of inspections shall be reported immediately to the division whenever a hazardous condition concerning a boiler or unfired pressure vessel is found to exist.
675 IAC 30-3-11: 675 IAC 30-3-11 Inspection reports | Justis AI