312 IAC 13-7-1

312 IAC 13-7-1 Well yield

Last amended: 2023Year: 2027Length: 105 wordsOfficial source

Cite as Ind. Admin. Code tit. 312, r. 13-7-1

Sec. 1. (a) Every well (which is to be equipped with a pump) shall be tested for yield. The well shall be test pumped at a capacity at least equal to the pumping rate desired from the well during normal usage. (b) A well shall be developed and tested at capacity for a minimum of one (1) hour. The yield and drawdown shall be recorded. (c) Pumping equipment shall be installed at a depth to allow for drawdown caused by: (1) the pumping equipment itself; and (2) seasonal water level fluctuations. (d) This section does not apply to a monitoring well or a dewatering well.