312 IAC 25-4-128

312 IAC 25-4-128 Permit reviews; revisions, renewals, transfer, sale, and assignment of rights granted under permits; permit renewals, general requirements

Last amended: 2025Year: 2027Length: 106 wordsOfficial source

Cite as Ind. Admin. Code tit. 312, r. 25-4-128

Sec. 128. (a) Any valid, existing permit issued under this program shall carry with it the right of successive renewal upon expiration of the term of the permit in accordance with sections 129 through 131 of this rule. Successive renewal shall be available only for those areas that were specifically approved by the director on the application for the existing permit as within the boundaries of the permit. (b) Permit renewal shall not be available for conducting surface coal mining and reclamation operations on lands beyond the boundaries of the permit area approved under the existing permit except as provided in section 129(b)(2) of this rule.
312 IAC 25-4-128: 312 IAC 25-4-128 Permit reviews; revisions, renewals, transfer, sale, and assignment of rights granted under permits; permit renewals, general requirements | Justis AI