312 IAC 25-4-41
312 IAC 25-4-41 Surface mining permit applications; reclamation and operations plan; existing structures
Cite as Ind. Admin. Code tit. 312, r. 25-4-41
Sec. 41. (a) Each application shall contain a description of each existing structure proposed to be used in connection with or to facilitate
the surface coal mining and reclamation operation. The description shall include the following:
(1) Location.
(2) Plans or photographs of the structure that describe or depict its current condition.
(b) Structures in existence prior to the implementation of this permanent program under IC 14-34-1 shall meet the performance
standards of IC 14-34-10, IC 14-34-11, and 312 IAC 25-6-5 through 312 IAC 25-6-132; however,
when the operator demonstrates in the application for a permit that immediate compliance is not practicable because of conditions not within the
control of the operator, such as:
(1) a strike;
(2) an act of God;
(3) equipment availability;
(4) weather; or
(5) force majeure;
the director may approve a schedule for modification of existing structures that achieves compliance with 312 IAC 25-6-5 through
312 IAC 25-6-132 within a reasonable period of time.