312 IAC 25-6-53
312 IAC 25-6-53 Surface mining; backfilling and grading; previously mined areas
Cite as Ind. Admin. Code tit. 312, r. 25-6-53
Sec. 53. (a) A remining operation on a site that contains a preexisting highwall shall comply with sections 49 through 52 of this rule, except
as provided under this section.
(b) Section 50(a)(2) of this rule does not apply to a remining operation if the volume of reasonably available soil is demonstrated in writing
to the director to be insufficient to completely backfill the reaffected or enlarged highwall. The highwall must be eliminated to the extent technically
practicable as follows:
(1) Spoil generated by the remining operation and any other reasonably available spoil shall be used to backfill the area. Reasonably
available spoil in the immediate vicinity of the remining operation shall be included within the permit area.
(2) The backfill shall be graded to a slope that is compatible with the approved postmining land use and provides adequate drainage
and long term stability.
(3) A highwall remnant shall be stable and shall not pose a hazard to the public health and safety or to the environment. The operator
shall demonstrate to the director that the highwall remnant is stable.
(4) Spoil placed on the outslope during previous mining operations shall not be disturbed if the disturbance will cause instability of
the remaining spoil or will otherwise increase hazards to public health, safety, or the environment.