312 IAC 29-10-4 Post testing schedule

Last amended: 2023Year: 2027Length: 58 wordsOfficial source

Cite as Ind. Admin. Code tit. 312, r. 29-10-4

Sec. 4. The application shall include a schedule for the following: (1) The length of time necessary for conducting the testing operations. (2) Actions to be taken upon conclusion of the testing operations and the timing of either: (A) converting the well to a production well or a Class II well; or (B) plugging and abandoning the well.