312 IAC 29-25-14

312 IAC 29-25-14 Registration and approval of new concrete production fluid storage structures

Last amended: 2026Year: 2027Length: 308 wordsOfficial source

Cite as Ind. Admin. Code tit. 312, r. 29-25-14

Sec. 14. (a) An owner or operator shall submit a plan for the construction and operation of a new concrete production fluid storage structure for approval by the division of reclamation. A new structure shall not be constructed until a determination is made that the plan meets the requirements of this section and the division of reclamation has issued a registration number to the structure. (b) The division of reclamation shall prescribe the form and other information to accompany the plan, which shall include the following: (1) Name and address of the owner of the structure. (2) Name of lease or production unit for the structure. (3) The location of the facility by quarter, quarter section, township, range, and county. (4) A map showing the location of the structure that indicates the distance and direction from the structure to the nearest public road intersection or other prominent landmark. (5) A plan view or sketch depicting the length, width, height, and maximum design capacity of the structure. (6) A plan view of the subsurface drainage and monitoring system to be installed beneath the structure to meet the requirements of section 15(b) of this rule. (7) A demonstration that the location of the structure meets the location requirements under section 15(a) of this rule. (8) Where any portion of the proposed structure will involve excavation, fill, or the construction or erection of structures within the one hundred (100) year floodplain of any river or stream, the plan shall include the following: (A) A demonstration that the top of the structure will be at least two (2) feet above the one hundred (100) year flood elevation. (B) One (1) of the following: (i) Written confirmation from the division of water that a permit is not required under IC 14-28-1. (ii) An approved application for construction within a floodway under IC 14-28-1.
312 IAC 29-25-14: 312 IAC 29-25-14 Registration and approval of new concrete production fluid storage structures | Justis AI