312 IAC 29-2-139

312 IAC 29-2-139 "Workover pit" defined

Last amended: 2023Year: 2027Length: 38 wordsOfficial source

Cite as Ind. Admin. Code tit. 312, r. 29-2-139

Sec. 139. "Workover pit" means an excavated lined pit or above ground vessel used while performing workover operations for storing or containing well fluids, cement, and any other fluids or solids used or encountered during the workover operations.
312 IAC 29-2-139: 312 IAC 29-2-139 "Workover pit" defined | Justis AI