312 IAC 29-2-33

312 IAC 29-2-33 "Completion pit" defined

Last amended: 2023Year: 2027Length: 58 wordsOfficial source

Cite as Ind. Admin. Code tit. 312, r. 29-2-33

Sec. 33. "Completion pit" means a lined pit used for storage of completion fluid waste including flow-back fluid, frac flow-back fluids, and drilling fluids or other materials that have been cleaned out of the well bore during the initial completion or stimulation of a well. Reserve pits may be used as a completion pit when drilling operations conclude.
312 IAC 29-2-33: 312 IAC 29-2-33 "Completion pit" defined | Justis AI