312 IAC 30-5-1

312 IAC 30-5-1 Applicability

Last amended: 2025Year: 2027Length: 97 wordsOfficial source

Cite as Ind. Admin. Code tit. 312, r. 30-5-1

Sec. 1. An applicant for a carbon sequestration project permit under this article is not required to obtain a carbon dioxide transmission pipeline certificate of authority under IC 14-39-1 or this article if the applicant is transporting carbon dioxide to an injection well, so long as the carbon dioxide injection well is located on a parcel of property that is: (1) owned by the applicant; and (2) inside the boundaries of contiguous property owned by the applicant; so that the applicant is only transporting carbon dioxide continuously on property owned by the applicant or under IC 14-39-1-4.5.
312 IAC 30-5-1: 312 IAC 30-5-1 Applicability | Justis AI