326 IAC 6.8-8-3

326 IAC 6.8-8-3 Plan requirements

Last amended: 2026Year: 2027Length: 162 wordsOfficial source

Cite as Ind. Admin. Code tit. 326, r. 6.8-8-3

Sec. 3. The continuous compliance plan (CCP) shall include the following: (1) A list of the processes and facilities at the source. (2) A list of the particulate matter control equipment associated with the processes and facilities listed in section 1 of this rule. (3) The process operating parameters critical to continuous compliance with the applicable PM10 or TSP mass and opacity limits, including applicable specific requirements listed in section 5 of this rule. (4) The particulate matter control equipment operating parameters critical to continuous compliance with the applicable PM10 or TSP mass and opacity including applicable requirements listed in section 6 of this rule. (5) The specific monitoring, recording, and record keeping procedures for process and control equipment for each facility in the CCP specified in subdivisions (1) and (2). (6) The procedure used to assure that adequate exhaust ventilation is maintained through each duct at facilities where emissions are captured by a collection hood and transported to a control device.
326 IAC 6.8-8-3: 326 IAC 6.8-8-3 Plan requirements | Justis AI