326 IAC 7-4-4
326 IAC 7-4-4 Wayne County sulfur dioxide emission limitations
Cite as Ind. Admin. Code tit. 326, r. 7-4-4
Sec. 4. The following sources and facilities located in Wayne County shall comply with the sulfur dioxide emission limitations in pounds
per million Btu, unless otherwise specified, and other requirements:
Source Facility
Description Emission Limitations
(1) Belden Corp. Boilers 3,4,5,6 (oil) (common stack) 1.6
(2) Earlham College Boilers 1 & 2 (oil/gas) (common stack) 1.6
(3) Johns-Manville Co. Boiler B-2 (oil/gas) 1.6
Glass Furnaces
SX-2,SX-3 (common stack) 9 pounds per ton
(4) Joseph Hill (Plant A) Boilers 1,2,4 (oil) (common stack) 1.6
Boiler 3
(oil) 1.6
(5) Joseph Hill (Plant B) Boilers 1,2,3 (oil/gas) (common stack) 0.3
(6) Kemper Boiler
1 (coal) 2.3
Boiler 2
(wood/coal) 2.1
Boiler 3
(wood/sawdust) 1.2
Kemper Boilers 1 and 2 also shall be limited to one and three-tenths (1.3) pounds per million Btu, and Boiler 3 also shall be limited to one
and two-tenths (1.2) pounds per million Btu based on the annual average sulfur content of the fuel over any twelve (12) consecutive month period.
(7) NATCO Boiler 1 (coal) 4.9
NATCO Boiler 1 also shall be limited to three and seven-tenths (3.7) pounds per million Btu based on the annual average sulfur content
of the fuel over any twelve (12) consecutive month period.
(8) Ralston Purina Co. Boilers 1 & 2 (oil/gas) common stack) 1.6
(9) Richmond Power and Light (RP&L)
Boilers 1 and 2 (coal) (common stack) 6.0
RP&L shall construct a new good engineering practice stack with height of at least three hundred twenty-five (325) feet above grade
by July 31, 1988.
(10) Richmond State Hospital Boilers 1,2,3,4 (coal) (common stack) 6.0
(11) Sanyo E&E Boiler 1 (coal) 4.9
Boiler 2
(coal) 4.9
Sanyo E&E Boilers 1 and 2 also shall be limited to three and nine-tenths (3.9) pounds per million Btu based on the annual average
sulfur content of the fuel over any twelve (12) consecutive month period.
(12) Wallace Metals Boiler 1 (oil/gas) 1.6