327 IAC 15-16-8

327 IAC 15-16-8 Design, construction, and operational requirements

Last amended: 2026Year: 2027Length: 58 wordsOfficial source

Cite as Ind. Admin. Code tit. 327, r. 15-16-8

Sec. 8. All permitted CAFOs must comply with the requirements of the following: (1) 327 IAC 19-4. (2) 327 IAC 19-7-6. (3) 327 IAC 19-8-3(b). (4) 327 IAC 19-10. (5) 327 IAC 19-11-1(a). (6) 327 IAC 19-12, unless an alternative design or compliance approach has been approved by the commissioner under 327 IAC 19-5-1. (7) 327 IAC 19-13.