327 IAC 20-4-4
327 IAC 20-4-4 Permit modifications
Cite as Ind. Admin. Code tit. 327, r. 20-4-4
Sec. 4. (a) The commissioner may issue a SMSS permit modification at any time.
(b) Changes to a SMSS requiring a permit modification include the following:
(1) Changes that increase storage capacity.
(2) Changes to approved design drawings or construction specifications.
(3) Any other changes the commissioner determines require a modification.
(c) If the change is not one listed in subsection (b), the owner or operator shall submit to the department:
(1) a written description of the change; and
(2) three (3) copies of any documents submitted under section 1 of this rule with revisions reflecting the
change.
(d) Fifteen (15) days after submitting a change under subsection (c), an owner or operator may implement the change unless the department
provides notification that:
(1) additional information is necessary to review the change; or
(2) the change requires a permit modification.
(e) When requesting a permit modification under subsection (b), the owner or operator shall submit three (3) copies of the request to the
department including:
(1) a description of the proposed modification; and
(2) documents submitted under section 1 of this rule with revisions reflecting the change.