327 IAC 2-10-2

327 IAC 2-10-2 Applicability

Last amended: 2026Year: 2027Length: 176 wordsOfficial source

Cite as Ind. Admin. Code tit. 327, r. 2-10-2

Sec. 2. (a) The secondary containment requirements of this rule apply to owners or operators of a facility storing liquid hazardous materials in an aboveground storage tank or storage area, or operating a transfer area for liquid hazardous materials as defined in section 4 of this rule, if the aboveground tank, storage area, or transfer area is constructed after the effective date of this rule and includes: (1) construction activities scheduled after the effective date of this rule; or (2) construction activities scheduled before the effective date of this rule only when physical construction did not begin within ninety (90) days after the effective date of this rule. (b) An existing aboveground tank, storage area, or transfer area must be brought into compliance with this rule when replaced or relocated. (c) The spill response plan requirements of this rule apply to owners or operators of a facility storing liquid hazardous materials in an aboveground storage tank or storage area, or operating a transfer area for liquid hazardous materials as defined in section 4 of this rule.
327 IAC 2-10-2: 327 IAC 2-10-2 Applicability | Justis AI