US lawIndianaRegulationsTitle 327 — Water Pollution Control DivisionArticle 3 — ARTICLE 3. WASTEWATER TREATMENT FACILITIES; ISSUANCE OF PERMITS; CONSTRUCTION AND PERMIT REQUIREMENTSRule 6 — Technical Standards for Sanitary Collection Systems3-6-15327 IAC 3-6-15327 IAC 3-6-15 Alignment requirementsLast amended: 2026Year: 2027Length: 32 wordsOfficial source Cite as Ind. Admin. Code tit. 327, r. 3-6-15Sec. 15. A sanitary sewer, between any two (2) manholes, shall be laid with straight alignment from the outlet centerline of the upstream pipe and the inlet centerline of the downstream pipe.Previous327 IAC 3-6-14Next327 IAC 3-6-16