327 IAC 5-1.5-66
327 IAC 5-1.5-66 "Total maximum daily load" or "TMDL" defined
Cite as Ind. Admin. Code tit. 327, r. 5-1.5-66
Sec. 66. "Total maximum daily load" or "TMDL" means the sum of the individual wasteload allocations for point sources and load
allocations for nonpoint sources and natural background minus the sum of a specified margin of safety and any capacity reserved for growth. If a
receiving water has only one (1) point source discharger, the TMDL is the sum of that point source WLA plus the LAs for any nonpoint sources
of pollution and natural background sources, tributaries, or adjacent segments minus the sum of a specified margin of safety and any capacity
reserved for growth. TMDLs can be expressed in terms of either mass per time, toxicity, or other appropriate measure. If best management practices
(BMPs) or other nonpoint source pollution controls make more stringent load allocations practicable, then wasteload allocations may be made less
stringent. Thus, the TMDL process provides for nonpoint source control tradeoffs. A TMDL sets and allocates the maximum amount of a pollutant
that may be introduced into a waterbody and still assure attainment and maintenance of water quality standards.