327 IAC 5-21-9

327 IAC 5-21-9 Monitoring

Last amended: 2026Year: 2027Length: 77 wordsOfficial source

Cite as Ind. Admin. Code tit. 327, r. 5-21-9

Sec. 9. Monitoring requirements shall be specified in an IWP permit: (1) to assure compliance with discharge limitations and other terms and conditions of the permit; (2) in accordance with the provisions of 327 IAC 5-2-13(c) through 327 IAC 5-2-13(e); and (3) may include monitoring for one (1) or more of the following: (A) Pollutant mass. (B) Pollutant concentration. (C) Other appropriate measurement for each pollutant as well as other parameters and conditions specified in the permit.
327 IAC 5-21-9: 327 IAC 5-21-9 Monitoring | Justis AI