327 IAC 8-10-9
327 IAC 8-10-9 Inspectors; reports of inspection or test
Cite as Ind. Admin. Code tit. 327, r. 8-10-9
Sec. 9. (a) All cross connection control device inspectors shall do the following:
(1) Be registered with the commissioner in accordance with section 11 of this rule.
(2) Submit reports of all inspections as required by subsection (b).
(3) Annually test and calibrate testing equipment for accuracy.
(4) Install an inspection tag upon completion of testing, calibration, or repair, of any cross connection control device. The inspection
tag must have at least the following information:
(A) The name of the inspector.
(B) The date of the inspection.
(C) The registration number, model number, serial number, and size of the cross connection control device.
The inspection tag must be waterproof and protected against tampering.
(b) The inspector shall report to the public water system, the customer and, if requested, the commissioner, on a form provided by the
commissioner, the results of inspections or tests conducted under section 8(b) of this rule on the following:
(1) Air gaps.
(2) Reduced pressure principle backflow preventers.
(3) Double check valve assemblies.
(4) Pressure vacuum breakers.
Reports shall be submitted to the public water system and to the customer within thirty (30) days of the inspection or test.