327 IAC 8-3.4-26

327 IAC 8-3.4-26 Conversion of a nonproduction well to a production well

Last amended: 2026Year: 2027Length: 118 wordsOfficial source

Cite as Ind. Admin. Code tit. 327, r. 8-3.4-26

Sec. 26. (a) A nonproduction well, such as a test well or a nonpublic water supply system well, must receive a construction permit in accordance with 327 IAC 8-3 before the well can be used as a production well to provide drinking water to a public water supply system. (b) The commissioner may require the following information, in accordance with sections 4 and 5 of this rule and 327 IAC 8-3-3, for the purpose of reviewing a proposed conversion of a nonproduction well to a production well to confirm that the proposed production well conforms with this rule: (1) As-built drawings. (2) Report discussing the proposed production well and its conformance to this rule and 327 IAC 8-3-4.
327 IAC 8-3.4-26: 327 IAC 8-3.4-26 Conversion of a nonproduction well to a production well | Justis AI