329 IAC 10-21-3

329 IAC 10-21-3 Duration of monitoring program

Last amended: 2026Year: 2027Length: 82 wordsOfficial source

Cite as Ind. Admin. Code tit. 329, r. 10-21-3

Sec. 3. (a) Once established at an MSWLF, ground water monitoring must be conducted throughout the active life, closure, and post-closure care periods of the MSWLF. (b) Ground water monitoring may be extended beyond the post-closure care period if an assessment ground water monitoring program or a corrective action program is being conducted at an MSWLF and the commissioner determines that an MSWLF unit within the MSWLF is adversely affecting ground water or poses a threat to human health or the environment.