329 IAC 10-37-3
329 IAC 10-37-3 Final cover; construction/demolition sites
Cite as Ind. Admin. Code tit. 329, r. 10-37-3
Sec. 3. (a) Owners or operators of a construction/demolition site shall apply no less than two (2) feet of final cover over any area in the
fill within one hundred eighty (180) days when:
(1) solid waste has not been disposed for one (1) year; or
(2) any area of the construction/demolition site has been filled to its approved elevation.
(b) The construction/demolition site must meet the following requirements for final cover:
(1) The maximum projected erosion rate must be five (5) tons per acre per year.
(2) The final compacted cover must be as specified in subsection (a).
(3) The final cover must have a slope of not less than two percent (2%) and not greater than thirty-three percent
(33%).