329 IAC 11.7-6-1
329 IAC 11.7-6-1 Operational requirements
Cite as Ind. Admin. Code tit. 329, r. 11.7-6-1
Sec. 1. (a) A facility that processes or stores alternative fuel or residue must have the following:
(1) An appropriate surface or pad for processing, such as concrete or asphalt, that will control spills and any liquids or leachate.
Examples of an appropriate surface would be concrete or asphalt. Facilities that are registered under this article that are only processing
uncontaminated wood or plastic are not required to process on a pad.
(2) Adequate measures in place to control fire hazards, and equipment available to control fires. The contingency action plan required
under 329 IAC 11.7-4-1(f)(13) must be submitted to the local fire department that services the area.
(3) A telephone, cellular telephone, or radio communication device available when employees are present and the building is in
use.
(4) Access control to the facility.
(5) A sign at least one (1) foot high by two (2) feet wide prominently displayed by the door or entrance to the facility and legibly
containing the following information:
(A) The name of the facility.
(B) The IDEM registration number.
(C) The name and phone number of a designated emergency contact person.
(6) Adequate control of the following:
(A) Dust.
(B) Odors.
(C) Wastewater.
(D) Vectors.
(E) Litter.
(F) Leachate.
(7) Monitoring of incoming alternative fuels. Any waste that the facility is not registered or permitted to receive for processing must
be isolated and removed from the facility.
(b) The owner or operator shall record and retain at the registered facility, or in an alternative location approved by the commissioner, all
records, reports, or audits required by this article until certification of closure is deemed adequate by the commissioner under 329 IAC 11.7-8-
1(e). The following information must be retained:
(1) A paper copy or an accessible copy of the electronically submitted registration submission.
(2) A contingency action plan as required under 329 IAC 11.7-4-1(f)(13).
(3) The records required under 329 IAC 11.7-5-1(b)(2).
(4) The training log required under subsection (f).
(5) The results of any waste determination tests on the residues generated by the registered facility.
(c) The following must be furnished as required and made available during normal operating hours for inspection by any officer, employee,
or representative of the commissioner:
(1) All records required by this article.
(2) All test results of the alternative fuels received and residues generated by the registered facility and
disposed.
(d) No hazardous waste that is regulated by 329 IAC 3.1 shall be processed at any registered facility, unless the facility is
permitted under 329 IAC 3.1 to process hazardous waste.
(e) Employees must be trained on safety, emergency, and operational procedures for the facility. A training log must be kept at the
registered facility for five (5) years stating the following:
(1) The name of the employee.
(2) Training topics.
(3) Hours of training.