LAC 43:XIII.1323
LAC 43:XIII.1323. Nondestructive Testing [49 CFR 192.243]
Cite as La. Admin. Code tit. 43, pt. XIII, § 1323
A. Nondestructive testing of welds must be performed by any process, other than trepanning, that will clearly indicate defects that may affect the integrity of the weld. [49 CFR 192.243(a)]
B. Nondestructive testing of welds must be performed: [49 CFR 192.243(b)]
1. in accordance with written procedures; and [49 CFR 192.243(b)(1)]
2. by persons who have been trained and qualified in the established procedures and with the equipment employed in testing. [49 CFR 192.243(b)(2)]
C. Procedures must be established for the proper interpretation of each nondestructive test of a weld to ensure the acceptability of the weld under §1321.C. [49 CFR 192.243(c)]
D. When nondestructive testing is required under §1321.B, the following percentages of each day's field butt welds, selected at random by the operator, must be nondestructively tested over their entire circumference: [49 CFR 192.243(d)]
1. in Class 1 locations, except offshore, at least 10 percent; [49 CFR 192.243(d)(1)]
2. in Class 2 locations, at least 15 percent; [49 CFR 192.243(d)(2)]
3. in Class 3 and Class 4 locations, at crossings of major or navigable rivers, offshore, and within railroad or public highway rights-of-way, including tunnels, bridges, and overhead road crossings, 100 percent unless impracticable, in which case at least 90 percent. Nondestructive testing must be impracticable for each girth weld not tested; [49 CFR 192.243(d)(3)]
4. at pipeline tie-ins, including tie-ins of replacement sections, 100 percent. [49 CFR 192.243(d)(4)]
E. Except for a welder or welding operator whose work is isolated from the principal welding activity, a sample of each welders or welding operator’s work for each day must be nondestructively tested, when nondestructive testing is required under §1321.B. [49 CFR 192.243(e)]
F. When nondestructive testing is required under §1321.B, each operator must retain, for the life of the pipeline, a record showing by milepost, engineering station, or by geographic feature, the number of girth welds made, the number nondestructively tested, the number rejected, and the disposition of the rejects. [49 CFR 192.243(f)]