LAC 43:XIII.2709

LAC 43:XIII.2709. Change in Class Location: Required Study [49 CFR 192.609]

Last amended: 2004Year: 2026Length: 211 wordsOfficial source

Cite as La. Admin. Code tit. 43, pt. XIII, § 2709

A. Whenever an increase in population density indicates a change in class location for a segment of an existing steel pipeline operating at a hoop stress that is more than 40 percent of SMYS, or indicates that the hoop stress corresponding to the established maximum allowable operating pressure for a segment of existing pipeline is not commensurate with the present class location, the operator shall immediately make a study to determine: [49 CFR 192.609] 1. the present class location for the segment involved; [49 CFR 192.609(a)] 2. the design, construction, and testing procedures followed in the original construction, and a comparison of these procedures with those required for the present class location by the applicable provisions of this Subpart; [49 CFR 192.609(b)] 3. the physical condition of the segment to the extent it can be ascertained from available records; [49 CFR 192.609(c)] 4. the operating and maintenance history of the segment; [49 CFR 192.609(d)] 5. the maximum actual operating pressure and the corresponding operating hoop stress, taking pressure gradient into account, for the segment of pipeline involved; and [49 CFR 192.609(e)] 6. the actual area affected by the population density increase, and physical barriers or other factors which may limit further expansion of the more densely populated area. [49 CFR 192.609(f)]
LAC 43:XIII.2709: LAC 43:XIII.2709. Change in Class Location: Required Study [49 CFR 192.609] | Justis AI