LAC 43:XIX.555

LAC 43:XIX.555. Requirements for Cavern Disposal

Last amended: 2003Year: 2026Length: 393 wordsOfficial source

Cite as La. Admin. Code tit. 43, pt. XIX, § 555

A. Applicants for new commercial solution-mined salt cavern facilities to receive and dispose of E and P Waste and operators of such existing facilities must comply with the administrative and technical criteria of LAC 43:XIX, Subpart 1, Chapter 5 (§501 et seq.) as well as the applicable definitions, administrative criteria and technical criteria of LAC 43:XVII, Subpart 4, Chapter 31 (§3101 et seq., Disposal of Exploration and Production Waste in Solution-Mined Salt Caverns). B. The application for a new commercial salt cavern for the disposal of E and P Waste shall include, but may not limited to the following information: 1. the general provisions of LAC 43:XVII.3103; 2. an application shall contain the information required in LAC 43:XVII.3107, as follows: a. §3107.B―Administrative Information; b. §3107.C―Maps and Related Information; c. §3107.D―Area of Review; d. §3107.E―Technical Information; 3. the legal permit conditions required in LAC 43:XVII.3109, as follows: a. §3109.A―Signatories; b. §3109.C―Duty to Comply; c. §3109.D―Duty to Halt or Reduce Activity; d. §3109.E―Duty to Mitigate; e. §3109.F―Proper Operation and Maintenance; f. §3109.G―Inspection and Entry; g. §3109.H. 3, 4, 7b, 8, 9 and 10―Notification Requirements; h. §3109.I―Duration of Permits; i. §3109.J―Compliance Review; j. §3109.K―Additional Conditions; 4. the location criteria of Statewide Order No. 29-M-2, LAC 43:XVII.3113; 5. the site assessment requirements of Statewide Order No. 29-M-2, LAC 43:XVII.3115; 6. the cavern and surface facility design requirements of Statewide Order No. 29-M-2, LAC 43:XVII.3117; 7. the well construction and completion requirements of Statewide Order No. 29-M-2, LAC 43:XVII.3119; 8. the operating requirements of Statewide Order No. 29-M-2, LAC 43:XVII.3121; 9. the safety requirements of Statewide Order No. 29-M-2, LAC 43:XVII.3123; 10. the monitoring requirements of Statewide Order No. 29-M-2, LAC 43:XVII.3125; 11. the pre-operating and completion report requirements of Statewide Order No. 29-M-2, LAC 43:XVII.3127; 12. the well and salt cavern mechanical integrity pressure and leak test requirements of Statewide Order No. 29-M-2, LAC 43:XVII.3129; 13. the requirements for determining cavern configuration and measuring cavern capacity in Statewide Order No. 29-M-2, LAC 43:XVII.3131; 14. the limits on cavern capacity in Statewide Order No. 29-M-2, LAC 43:XVII.3133; 15. the requirements for inactive caverns in Statewide Order No. 29-M-2, LAC 43:XVII.3135; 16. the monthly reporting requirements of Statewide Order No. 29-M-2, LAC 43:XVII.3137; 17. the record retention requirements of Statewide Order No. 29-M-2, LAC 43:XVII.3139; 18. the applicable closure and post-closure requirements of Statewide Order No. 29-M-2, LAC 43:XVII.3141.
LAC 43:XIX.555: LAC 43:XIX.555. Requirements for Cavern Disposal | Justis AI