LAC 43:XV.5903

LAC 43:XV.5903. Coal Processing Plants: Performance Standards

Last amended: 1994Year: 2026Length: 304 wordsOfficial source

Cite as La. Admin. Code tit. 43, pt. XV, § 5903

A. Construction, operation, maintenance, modification, reclamation and removal activities at operations covered by this Chapter shall comply with the following. 1. Signs and markers for the coal processing plant, coal processing waste disposal area and water treatment facilities shall comply with §5301. 2. Roads, transport and associated structures shall be constructed, maintained and reclaimed in accordance with §§5433-5435. 3. Any stream or channel realignment shall comply with §5323. 4. If required by the office, any disturbed area related to the coal processing plant or associated facilities shall have sediment control structures, in compliance with §§5325 and 5327, and all discharges from these areas shall meet the requirements of §§5319-5321 and any other applicable state or federal law. 5. Permanent impoundments associated with coal processing plants shall meet the requirements of §§5333 and 5347. Dams constructed of or impounding coal processing waste shall comply with §§5391-5395. 6. Use of water wells shall comply with §5341 and water rights shall be protected in accordance with §5343. 7. Disposal of coal processing waste, solid waste and any excavated material shall comply with §§5375-5387, 5389, and 5365-5371, respectively. 8. Discharge structures for diversions and sediment control structures shall comply with §5329. 9. Air pollution control measures associated with fugitive dust emissions shall comply with §5397. 10. Fish, wildlife and related environmental values shall be protected in accordance with §5399. 11. Slide areas and other surface areas shall comply with §5401. 12. Reclamation shall include proper topsoil handling procedures, revegetation and abandonment in accordance with §§5309-5317, 5347, 5403-5415, 5417-5423, and 5427-5431. 13. Conveyors, buildings, storage bins or stockpiles, water treatment facilities, water storage facilities, and any structure or system related to the coal processing plant shall comply with Chapter 53. 14. Any coal processing plant or associated structures located on prime farmland shall meet the requirements of Chapter 55.
LAC 43:XV.5903: LAC 43:XV.5903. Coal Processing Plants: Performance Standards | Justis AI