LAC 33:III.1437

LAC 33:III.1437. Commitments for Project-Level Mitigation and Control Measures

Last amended: 2009Year: 2026Length: 153 wordsOfficial source

Cite as La. Admin. Code tit. 33, pt. III, § 1437

A. In accordance with 40 CFR 93.125(c), prior to making a project-level conformity determination for a transportation project, the FHWA/FTA must obtain from the project sponsor and/or operator written commitments, as defined in 40 CFR 93.101, to implement any project-level mitigation or control measures in the construction or operation of the project identified as conditions for NEPA process completion. The written commitments to implement those project-level mitigation or control measures must be fulfilled by the appropriate entities. Prior to making a conformity determination of the transportation plan or TIP, the MPO, where one exists, or the MPO's designee, shall ensure that any project-level mitigation or control measures are included in the project design concept and scope, and are appropriately identified in the regional emissions analysis used in the conformity analysis. Written commitments must be obtained before such mitigation or control measures are used in a project-level hot-spot conformity analysis for a project-level determination.
LAC 33:III.1437: LAC 33:III.1437. Commitments for Project-Level Mitigation and Control Measures | Justis AI