LAC 33:IX.4741
LAC 33:IX.4741. As an owner or operator of a Phase II existing facility, what monitoring must I perform?
Cite as La. Admin. Code tit. 33, pt. IX, § 4741
A. As an owner or operator of a Phase II existing facility, you must perform monitoring, as applicable, in accordance with the technology installation and operation plan required by LAC 33:IX.4739.B.4.b, the restoration plan required by LAC 33:IX.4739.B.5, the verification monitoring plan required by LAC 33:IX.4739.B.7, and any additional monitoring specified by the state administrative authority to demonstrate compliance with the applicable requirements of LAC 33:IX.4737.