LAC 33:V.1803

LAC 33:V.1803. Closure and Post-Closure Care

Last amended: 1998Year: 2026Length: 248 wordsOfficial source

Cite as La. Admin. Code tit. 33, pt. V, § 1803

A. At closure of a containment building, the owner or operator must remove or decontaminate all waste residues, contaminated containment system components (liners, etc.), contaminated subsoils, and structures and equipment contaminated with waste and leachate and manage them as hazardous waste unless LAC 33:V.109.Hazardous Waste applies. The closure plan, closure activities, cost estimates for closure, and financial responsibility for containment buildings must meet all of the requirements specified in LAC 33:V.Chapters 35 and 37. B. If, after removing or decontaminating all residues and making all reasonable efforts to effect removal or decontamination of contaminated components, subsoils, structures, and equipment as required in Subsection A of this Section, the owner or operator finds that not all contaminated subsoils can be practicably removed or decontaminated, he must either: 1. close the facility and perform post-closure care in accordance with the closure and post-closure requirements that apply to landfills (LAC 33:V.2521). In addition, for the purposes of closure, post-closure, and financial responsibility, such a containment building is then considered to be a landfill and the owner or operator must meet all of the requirements for landfills specified in LAC 33:V.Chapters 35 and 37; or 2. perform a risk assessment to demonstrate that closure with the remaining contaminant levels in protective of human health and the environment in accordance with LAC 33:I.Chapter 13. Any such risk assessment is subject to approval by the administrative authority and must demonstrate that post-closure care is not necessary to adequately protect human health and the environment.
LAC 33:V.1803: LAC 33:V.1803. Closure and Post-Closure Care | Justis AI