LAC 33:V.3509
LAC 33:V.3509. Closure Financial Responsibility
Cite as La. Admin. Code tit. 33, pt. V, § 3509
A. The operator shall submit, with the permit application, a closure plan which provides the estimated cost of closure, and post-closure monitoring including long-term monitoring devices, and the number of years of estimated operation before closure, and which is designed to minimize the need for future maintenance and to ensure against leakage or escape of hazardous waste.
B. The operator shall create a “closure fund” under the requirements in LAC 33:V.Chapters 35 and 37.