LAC 33:XV.1407
LAC 33:XV.1407. Surveys
Cite as La. Admin. Code tit. 33, pt. XV, § 1407
A. A confirmatory survey for each potentially contaminated site shall be performed within 90 days of the effective date of these regulations.
B. Follow-up confirmatory surveys shall be performed whenever activities at the site could result in a possible change in the regulatory status of the site.
C. Upon completion of survey(s) of equipment and facilities that verify that NORM regulated by this Chapter is not present, an individual may submit documentation to the Office of Environmental Compliance indicating that the equipment and facilities are exempt from the requirements of this Chapter pursuant to LAC 33:XV.1404.
D. Any survey submitted to the department shall include the qualifications of the individual performing the survey. Individuals performing and documenting the surveys shall demonstrate understanding of the subjects outlined in LAC 33:XV.1499.Appendix A.