No. 8 (1974)
Number 8 August 22, 1973
Cite as Mass. Op. Att'y Gen. No. 8, Rep. A.G., Pub. Doc. No. 12 (1974)
Number 8
August 22, 1973
Mr. Walter J. Poitrast
Director of Building Construction
Leverett Saltonstall Building
100 Cambridge Street
Boston, Massachusetts 02202
Dear Mr. Poitrast:
1 am in receipt of your request for my opinion with regard to whether
the Director of Building Construction and the Secretary of Transporta-
tion and Construction must comply with the procedures outlines
in G.
L. c. 7, § 30B when employing an architect or engineer to prepare a pre-
liminary plan or specification for improvements necessary to maintain
state-owned property pursuant to G. L.
c. 6A, § 28.
As you have stated, G. L. c. 7, § 30B establishes a Designer Selection
Board and outlines the Board's authority with respect to projects under-
taken by the Bureau of Building Construction. Specifically, G. L. c. 7, §
30B provides in pertinent part:
"Any project subject to the control and supervision of the
director of building construction
.
.
.
shall be referred by the
commissioner [Commissioner of Administration and Finance]
to the board, which
shall promptly
provide
suitable
public
notice of the proposed project."
General Laws,
c.
7,
§ 30B further delineates the procedure for selec-
tion of a designer for such projects through a process of recommenda-
tion made by the Board to the Commissioner of Administration and Fi-
nance who
has
ultimate
responsibility
in
appointing
a
designer.
See
1965-66 Op.
Atty. Gen.
151. The procedure outlined by G.
L.
c.
7,
§
30B clearly must be followed in approving a designer for "any project"
subject
to
control
of the
Director of Building Construction.
General
62
P.D.
12
Laws,
c. 6A,
§ 22 enacted simultaneously with G.
L.
c.
7,
§ 30B,
in-
cludes within such projects "all building construction projects" meeting
three specific criteria as to (1) source of funding, (2) estimated cost, and
(3) type of construction or repair. The procedures of G. L.
c.
7,
§ 30B,
then, must be followed before a designer can be selected to undertake an
actual construction project subject to the control and supervision of the
Director of Building Construction.
On the other hand, G. L.
c. 6A, § 28 specifically deals with examina-
tion of requests for projects pursuant to G.
L.
c.
29,
§ 7 and for de-
velopment of projects of his own by the Director of Building Construc-
tion, ''whenever in his judgment the maintenance of state-owned prop-
erty requires such improvements to prevent deterioration or costly fu-
ture repair." (Emphasis supplied.) That G. L.
c. 6A,
§ 28
is addressed
to preliminary study of potential construction projects in which the Di-
rector of Building Construction has authority to employ architects, en-
gineers,
etc. on
a temporary basis without any proceeding before the
Designer Selection Board,
is clear from the following language of that
section:
"Said director
shall cause to be made and
filed with him
preliminary plans and descriptive specifications sufficient for
a careful estimate by a competent expert; and for such pur-
pose such sums as may be appropriated or otherwise made
available therefor may,
with
his approval, be expended and
he may, with the approval of the secretary, employ temporar-
ily such architects, engineers, contractors and consultants as
may be necessary."' (Emphasis supplied.)
Thus, such preliminary studies are not "projects" for the purposes of
G. L.
c.
7,
§ 30B, and as defined in G.
L.
c. 6A,
§ 22, but rather they
are
initial
steps
in
estimating costs
of potential
projects. The em-
ployment of temporary designers for such preliminary studies
is within
the discretion of the Director of Building Construction and the Secretary
of Transportation and Construction. Accordingly,
it
is my opinion that
the Director of Building Construction and the Secretary of Transporta-
tion and Construction need not comply with the procedures delineated
in G. L. c. 7, § 30B when appointing temporary architects for the limited
purposes authorized by G. L.
c. 6A,
§ 28.
Very truly yours,
ROBERT H. QUINN
Attorney General
P.D.
12
63