310 CMR 10.14
Restoration Order of Conditions
If after reviewing a Notice of Intent for an Ecological Restoration Project, the issuing
authority determines that the Ecological Restoration Project meets the eligibility criteria in
310 CMR 10.13(1) and the applicable provisions of 310 CMR 10.13(2) through (7), the issuing
authority shall issue a Restoration Order of Conditions that contains the general conditions set
forth in 310 CMR 10.14(1), and all applicable special conditions set forth in 310 CMR 10.14(2)
through (7). The Restoration Order of Conditions may reference the plans and specifications for
the Ecological Restoration Project approved by the issuing authority. If the Restoration Order
of Conditions is issued in response to a Combined Application for an Order of Conditions
pursuant to 310 CMR 10.00, a 401 Water Quality Certification pursuant to 314 CMR 9.00: 401
Water Quality Certification for Discharge of Dredged or Fill Material, Dredging, and Dredged
Material Disposal in Waters of the United States Within the Commonwealth, and/or a Chapter
91 license, permit or other written approval pursuant to 310 CMR 9.00: Waterways, the
Department may append to the Restoration Order of Conditions any conditions that the
Department has authority to impose pursuant to 310 CMR 9.00: Waterways and/or 314 CMR
9.00: 401 Water Quality Certification for Discharge of Dredged or Fill Material, Dredging, and
Dredged Material Disposal in Waters of the United States Within the Commonwealth. A
Restoration Project Order of Conditions is subject to the provisions of 310 CMR 10.05 that apply
to any Order of Conditions except as expressly provided otherwise in 310 CMR 10.00.
(1) General Conditions Applicable to all Ecological Restoration Projects. The Restoration
Order of Conditions shall contain the following general conditions:
(a) Failure to comply with all conditions stated herein and with all related statutes and other
regulatory measures shall be deemed cause to revoke or modify this Restoration Order of
Conditions.
(b) This Restoration Order of Conditions does not grant any property rights or any exclusive
privileges; it does not authorize any injury to private property or invasion of private rights.
(c) This Restoration Order of Conditions does not relieve the permittee or any other person
of the necessity of complying with all applicable federal, state or local statutes, ordinances,
bylaws or regulations.
(d) The work authorized under this Restoration Order of Conditions shall be completed
within three years from the date of issuance of this General Order unless the General Order
is extended in accordance with 310 CMR 10.05(6)(d) or by operation of law.
(e) This Restoration Order of Conditions may be extended by the issuing authority for one
or more periods of up to three years upon application to the issuing authority at least 30 days
prior to the expiration date of this Restoration Order.
(f) Any fill used in connection with this project shall be clean fill. Any fill shall contain no
trash, refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath,
paper, cardboard, pipe, trees, ashes, refrigerators, motor vehicles or parts of any of the
foregoing.
(g) This Restoration Order of Conditions is not final until all administrative appeal periods
from this Restoration Order have elapsed or if such an appeal has been taken, until all
proceedings before the Department have been completed.
(h) No work shall be undertaken until the Restoration Order of Conditions has become final
and has been recorded in the Registry of Deeds or the Land Court for the district in which
the land is located within the chain of title to the affected property. In the case of recorded
land, the Final Restoration Order of Conditions shall also be noted in the Registry's Grantor
index under the name of the owner of the land upon which the proposed work is done. The
recording information shall be submitted to the Issuing Authority prior to commencement
of the work.
(i) A sign that is not less than two square feet or more than three square feet shall be
displayed at the site. The sign shall bear the words "Massachusetts Department of
Environmental Protection" and include the File Number.
(j) Where the Department is requested to issue a Superseding Order, the Conservation
Commission shall be a party to all agency proceedings and hearings before the Department.
(k) Upon completion of the work described herein, the applicant shall submit a Request for
a Certificate of Compliance to the issuing authority.
(l) The work shall conform to the plans and special conditions referenced in this Restoration
Order of Conditions.
10.14: continued
(m) Any change to the plans approved in this Restoration Order of Conditions shall require
the applicant to inquire of the Issuing Authority in writing whether the change is significant
enough to require the filing of a new Notice of Intent.
(n) Representatives of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Restoration Order
of Conditions at reasonable hours to evaluate compliance with the conditions set forth in this
Restoration Order of Conditions and may require the submittal of any data deemed necessary
by the Conservation Commission or the Department for that evaluation.
(o)
This Restoration Order of Conditions shall apply to any successor in interest or
successor in control of the property subject to this Restoration Order of Conditions and to
any contractor or other person performing work conditioned by this Order.
(p) Prior to the start of work, and if the project involves work adjacent to a Bordering
Vegetated Wetland or Salt Marsh, the boundaryof the wetland in the vicinity of the proposed
work area shall be marked by wooden stakes or flagging. Once in place, the wetland
boundary markers shall be maintained until a Certificate of Compliance has been issued by
the issuing authority.
(q) All sedimentation barriers shall be maintained in good repair, until all disturbed areas
have been fully stabilized with vegetation or other means. During construction, the applicant
or his or her designee shall inspect the erosion controls on a daily basis and shall remove
accumulated sediments as needed. The applicant shall immediately control any erosion
problems that occur at the site and shall also immediately notify the issuing authority. The
Issuing Authority reserves the right to require any additional erosion and/or damage
prevention controls it deems necessary. Sedimentation barriers shall serve as the limit of
work unless another limit of work line has been approved by this Order.
(r) The project shall be conducted in accordance with any preliminary written determination
obtained from the Natural Heritage and Endangered Species Program as set forth in
310 CMR 10.11(2) and any time of year restrictions or other conditions recommended in
writing by the Division of Marine Fisheries (for projects in coastal Resource Areas) and the
Division of Fisheries and Wildlife (for projects in inland Resource Areas) as set forth in
310 CMR 10.11(3) through (5).
(s) The applicant shall implement the plan submitted with the Notice of Intent as approved
by the Issuing Authority to prevent and control invasive species.
(t) If the project involves the dredging of 100 cubic yards or more in a Resource Area or
dredging of any amount in an Outstanding Resource Water, the dredging and Dredged
Material management shall be performed in accordance with the Water Quality Certification
submitted with the Notice of Intent.
(u)
If the project involves infrastructure, the owner shall operate and maintain the
infrastructure in accordance with the operation and maintenance plan submitted with the
Notice of Intent as approved by the Issuing Authority. Implementation of the operation and
maintenance plan as approved by the Issuing Authority shall be a continuing condition that
shall be set forth in the Certificate of Compliance.
(2)
Special Conditions for Dam Removal Projects. If the Ecological Restoration Project
involves dam removal, the Restoration Order of Conditions shall contain the following special
conditions in addition to the general conditions set forth in 310 CMR 10.14(1):
(a) An as-built plan and a written statement from a registered professional engineer or other
environmental professional expert in ecological restoration certifying substantial compliance
with the design plan and construction specifications approved in the Restoration Order of
Conditions shall be submitted to the Issuing Authority within 90 days of completion of the
dam removal.
(b) The applicant shall monitor the dam removal site during the first two years following
completion of the dam removal. Said monitoring shall include a topographic survey of the
longitudinal profile and stream cross-sections from downstream of the former dam through
the upstream end of the former impoundment. The survey reference point shall comprise a
permanent marker or recoverable survey point with known coordinates, such as a fixed point
shown on the as-built plan, an existing bench mark, or a new benchmark. That marker
should be identified or referenced on the plans and on the as-built plans. The applicant shall
establish at least two photo-points for pre- and post-restoration monitoring at the dam
removal site. At least one photo-point location shall be chosen to document a view of the
dam pre-restoration and to document the same site after the dam is removed. A second
location shall be chosen to document a view of the impoundment pre- and post-restoration.
Photos shall be taken for two years after the dam removal is completed.
10.14: continued
(c) The applicant shall submit a report detailing the results of this monitoring within six
months of the completion of the two year post-construction monitoring period, or within 30
months after the dam removal is complete whichever is sooner. The report shall include a
comparison of post-restoration survey data with pre-restoration survey data as illustrated by
the photos taken during the monitoring period.
(3) Special Conditions for Freshwater Stream Crossing Repair and Replacement Projects. If
the Ecological Restoration Project involves freshwater crossing repair or replacement, the
Restoration Order of Conditions shall contain the following special conditions in addition to the
general conditions set forth in 310 CMR 10.14(1):
(a) An as-built plan and/or a written statement from a registered professional engineer or
other environmental professional expert in ecological restoration certifying substantial
compliance with the design plans and construction specifications approved in the Restoration
Order of Conditions shall be completed within 90 days of completion of construction. The
as-built plan shall include the dimensions of the structure, the invert elevation of the
upstream and downstream ends of the structure and the road or other surface elevation above
the structure.
(b) The applicant shall monitor the site by collecting sufficient data within 12 months after
construction is complete to evaluate the effect of the structure. At a minimum, when a
Certificate of Compliance is requested, the applicant shall provide post-construction
photo-points that capture longitudinal views of the crossing inlet, the crossing outlet and the
upstream and downstream channel beds during low flow conditions. The photo-points shall
be located at the same geographic photo-point latitude and longitude coordinates as required
in the Notice of Intent per 310 CMR 10.12(1)(n). The applicant shall submit a report to the
Issuing Authority detailing the results of this monitoring within 18 months after construction
is complete. The report shall include a comparison of the post-restoration data with
pre-restoration data.
(4) Special Conditions for Stream Daylighting Projects. If the Ecological Restoration Project
involves stream daylighting, the Restoration Order of Conditions shall include the following
special conditions in addition to the general conditions set forth in 310 CMR 10.14(1):
(a) An as-built plan and a written statement from a registered professional engineer or other
environmental professional expert in ecological restoration certifying substantial compliance
with the design plan and construction specifications approved in the Restoration Order of
Conditions shall be submitted to the Issuing Authority within 90 days of completion of the
project. At a minimum, when a Certificate of Compliance is requested, the applicant shall
provide post-construction photo-points that capture longitudinal views of the upstream and
downstream channel beds of the daylighted reach during low flow conditions.
(b)
The applicant shall conduct photo-point monitoring by establishing at least three
photo-points for pre- and post-restoration monitoring at the stream daylighting site. One
photo-point location shall be chosen to document the upstream end of the site and one
photo-point location shall be chosen to document the downstream end of the site. A third
photo-point shall be chosen to document conditions in the restored channel. Photos shall be
taken during high flow and low (summer) flow of each year during the two years following
completion of the project.
(c) Within 30 months after the completion of the project, the applicant shall submit a report
describing the ecological changes observed at the project site during the two years following
completion of the project, as illustrated by the photos.
(5) Special Conditions for Tidal Restoration Projects. If the Ecological Restoration Project
involves restoration of tidal influence, the Restoration Order of Conditions shall contain the
following special conditions in addition to the general conditions set forth in 310 CMR 10.14(1):
(a) If the project is a culvert or bridge replacement or repair project, an as-built plan and a
written statement from a registered professional engineer or other environmental professional
expert in ecological restoration certifying substantial compliance with the design plans and
construction specifications approved in the Restoration Order of Conditions shall be
submitted to the Issuing Authority within 90 days of completion of construction. The
as-built plan shall include the dimensions of the structure, the invert elevation of the
upstream and downstream ends of the structure and the road or other surface elevation above
the structure.
10.14: continued
(b) The applicant shall monitor pre- and post-construction tidal conditions upstream and
downstream of the tidal restriction with water level readings measured at an interval no
greater than every ten minutes over a minimum of a one-week period that includes a spring
tide. Pre- and post-construction water level readings shall be taken at approximately the
same locations and shall be referenced to the same vertical elevation datum. The applicant
shall prepare a report detailing the results of this monitoring within 12 months after
construction is complete. The report shall include and compare pre- and post-construction
tidal elevation monitoring data to assess attainment of the project's predicted post-restoration
tidal conditions.
(6) Special Conditions for Rare Species Habitat Restoration. If the Ecological Restoration
Project is a Rare Species Habitat Restoration Project, the Restoration Order of Conditions shall
in addition to the general conditions set forth in 310 CMR 10.14(1) include the following special
conditions:
(a) An as-built plan and a written statement from a registered professional engineer or other
environmental professional expert in ecological restoration certifying substantial compliance
with the design plan, construction specifications, and the Habitat Management Plan
submitted with the Notice of Intent as approved in the Restoration Order of Conditions shall
be submitted to the Issuing Authority within 90 days of completion of the project.
(b) The applicant shall establish at least two photo-points for pre- and post-restoration
monitoring at the project site. Photos shall be taken for two years after construction is
complete. Within 30 months of completion of the project, the applicant shall submit to the
Issuing Authority a report describing the ecological changes observed at the project site as
illustrated by the photos.
(7) Special Conditions for Fish Passageway Restoration Projects. If the Ecological Restoration
Project involves the repair or replacement of a fish passageway, the Restoration Order of
Conditions shall in addition to the general conditions set forth in 310 CMR 10.14(1) contain the
following special conditions:
(a) The property owner is responsible for maintaining and repairing the fishway in good
condition so that it will support safe and efficient fish passage in accordance with an
operation and maintenance plan approved by the Division of Marine Fisheries. This
requirement is a continuing condition that shall be set forth in the Certificate of Compliance.
(b) A post-construction project summary using surveys, a narrative and photographs as
needed, that confirm the fishway slope and entrance and exit elevations shall be submitted
to and approved by the Division of Marine Fisheries, prior to submittal of a request for a
Certificate of Compliance.