310 CMR 15.101
Site Evaluation Criteria
(1) Every proposed disposal area shall be examined by a Soil Evaluator and the Approving
Authority to determine if the disposal area is compatible with the proposed sewage disposal
system in relation to the design flow set forth in 310 CMR 15.203 and system location criteria
set forth in 310 CMR 15.106.
(2) Every proposed disposal area shall be assessed based on the following field test and analysis
criteria:
(a) deep observation hole testing;
(b) soil profile determination;
(c) percolation testing;
(d) landscape position; and
(e) hydrogeologic properties
(3) Site evaluation may be conducted at any time of the calendar year, provided that the Soil
Evaluator makes and records on the site evaluation form proper consideration of the
hydrogeologic properties of the specific site as required in 310 CMR 15.107 for the period of the
water year within which the evaluation is performed.